Hamilton



Costumer: HAMILTON CENTER EUROPE

Object of activity: PRODUCTION AND OFFICE BUILDING

Location: TIMIȘOARA

Project details:
Construction of office, production building, gatehouse, enclosure, bore holes, basin and fire station, roads and platforms, utilities on premises.
Works executed:
- architecture
- resistance
- heating/sanitary/air-conditioning/solar plants
- fire prevention and fighting system
- electric wiring
- roads and platforms
Built area: 6,740 m²
Installed electric power: 700 kW
Installed heating power: 160 kW;
Installed cooling power: 140 kW;
Production floor ventilation system: 40,000 m³/h

By continuing to use the site, you agree to the use of cookies. <br>Continuând să utilizați site-ul, sunteți de acord cu utilizarea cookie-urilor.
more information / mai multe informatii

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this. For more information take a look at our Privacy notice.
Setările cookie-urilor de pe acest site sunt setate să permită "permiterea modulelor cookie" pentru a vă oferi cea mai bună experiență de navigare posibilă. Dacă continuați să utilizați acest site fără a modifica setările cookie-urilor sau dați clic pe "Acceptați" mai jos, atunci sunteți de acord cu acest lucru. Pentru mai multe informații, aruncați o privare la Notificare de Confidențialitate.

Close