Production and storage floor, packaging warehouse, technical areas, outdoor platforms, gatehouse, enclosure, spare water basin for firefighting, utilities.
Works executed:
- architecture
- resistance
- heating/sanitary/air-conditioning plants
- fire prevention and fighting system
- electric wiring
- roads and platforms
Built area: 6,100 m²
Installed electric power: 800 kW
Production / storage floor ventilation system: 72,400 m³/h
Water tank for outdoor hydrants: 174 m3;
Water tank for indoor hydrants: 11 m3;