Extension of the existing production and storage floor (P) administration building (P+1E), canteen (P), parking places, interior roads, new access from Barcelona street, access modifications Salzburg street, tehnical annex (water tank, garbage deposit, interior networks, rain water, gatehouse, indoor non-structural modifications by the existing building, enclosure.
Works executed
- architecture
- resistance
- heating/sanitary/air-conditioning plants
- fire prevention and fighting system
- electric wiring
- roads and platforms
Built area: 9.517 m²
Access and indoor roads: 13980 m²
Parking areas: 10.162 m²
Installed electric power: 1.600 kW
Installed heating power: 700 kW;
Installed cooling power: 1.100 kW;
Production floor ventilation system: 84.000 m³/h
Ventilation system for office buildings and annexes:25.500 m³/h
Ventilation system for the canteen: 19.000 m³/h
Fire fighting pumping station with electric pump, diesel pump and pump pressure maintenance: 9.500 l/min at 10.5 bar.