Testing lab and offices P+4E+EP
Works executed:
- architecture
- resistance
- heating/sanitary/air-conditioning plants
- fire prevention and fighting system
- electric wiring
- roads and platforms
Built area: 51.985 m²
Access and indoor roads: 13.630 m²
Installed electric power: 2.800 kW
Installed heating power: 1740 kW;
Installed cooling power: 1.700 kW;