Test laboratory of fuel systems and office area
Works executed:
- heating/sanitary/air-conditioning plants
- fire prevention and fighting system
Built area: 1.800m²
Installed heating power: 1.000 kW;
Installed cooling power: 862 kW;
Ventilation system laboratory building operating in ATEX environment: 76.900 m³/h
Ventilation systems clean room: 2.700m³/h
Ventilation systems: 4.100m³/h