Project details: Greenfield investments in Brasov for the production of fuel units
Works executed:
- heating/sanitary/air-conditioning plants
- fire prevention and fighting system
Built area: 9.517m²
Installed heating power: 3.000 kW;
Installed cooling power: 2.800 kW;
Ventilation system production hall: 195.000 m³/h
Ventilation system office buildings and annexes: 16.500m³/h
Ventilation system canteen: 4.800m³/h
Fire fighting pumping station with electric pump, diesel pump and pump pressure maintenance: 9.333l/min at 11.5 bar.