Continental Automotive Timișoara



Costumer: CONTINENTAL AUTOMOTIVE TIMIȘOARA - PRODUCTION FLOOR

Object of activity:

Location: TIMIȘOARA

Project details:
Extension of the existing assembly floor, extension of the existing technical annex, indoor non-structural repartitioning of the existing shop floor, dome closure, interior road facilities, recyclable packaging platform, premises networks – Timișoara, str. Siemens nr. 1
Works executed:
- architecture
- resistance
- heating/sanitary/air-conditioning plants
- fire prevention and fighting system
- electric wiring
- roads and platforms
Built area: 4,256m²
Installed electric power: 2,500 kW
Installed heating power: 900 kW;
Installed cooling power: 2,300 kW;
Production floor ventilation system: 80,000 m³/h
Ventilation system for clean room: 7,500 m³/h
Oil-free compressed air station 50.m³/min at 8 ba

By continuing to use the site, you agree to the use of cookies. <br>Continuând să utilizați site-ul, sunteți de acord cu utilizarea cookie-urilor.
more information / mai multe informatii

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this. For more information take a look at our Privacy notice.
Setările cookie-urilor de pe acest site sunt setate să permită "permiterea modulelor cookie" pentru a vă oferi cea mai bună experiență de navigare posibilă. Dacă continuați să utilizați acest site fără a modifica setările cookie-urilor sau dați clic pe "Acceptați" mai jos, atunci sunteți de acord cu acest lucru. Pentru mai multe informații, aruncați o privare la Notificare de Confidențialitate.

Close