Construction of office, production building, gatehouse, enclosure, bore holes, basin and fire station, roads and platforms, utilities on premises.
Works executed:
- architecture
- resistance
- heating/sanitary/air-conditioning/solar plants
- fire prevention and fighting system
- electric wiring
- roads and platforms
Built area: 6,740 m²
Installed electric power: 700 kW
Installed heating power: 160 kW;
Installed cooling power: 140 kW;
Production floor ventilation system: 40,000 m³/h